©2005 Arnesen Home & Design. All rights reserved
AHD was involved in working on this house.  There were a total of three houses being
built at the same time.  As this was a smaller house, our time limit was five weeks.  I
brought with me, my partner's son Trevor.  Together we framed it, did the insulation,
drywall, taping, "orange peel" spray texture, primed and painted walls & ceilings, installed
cabinets, doors, hardwood flooring, casing, baseboard, hardware & stairs.
<Back /Next>